top of page
  • Instagram
Linkedin Blanco.png
  • Instagram
Linkedin Blanco.png
  • Instagram
Linkedin Blanco.png

3D Coordination
City Hall Subway

Infraestructure

Date

December 2024

CANADA

Vancouver

BSP_RW_CH_ZZ_AR_R20_BBr-01.png

Project Overview:

Our client, RWC, approached us to assist with detailed design modeling of the ceiling systems within a subway station. The goal was to support coordination efforts across disciplines by providing an accurate LOD 350 model focused on ceiling structures and components.

Using precise reference data, our team developed a Revit model that aligned with the design intent while resolving spatial constraints typical in underground transit environments. This model enabled the client and project stakeholders to identify potential clashes early and streamline the overall coordination process.

Key Highlights:

  • Ceiling-focused 3D modeling in Autodesk Revit

  • Geometry built to support design and coordination

  • Improved clash detection and spatial planning

  • Collaboration with RWC design and coordination teams

BSP_RW_CH_ZZ_AR_R20_BBr-02.png
BSP_RW_CH_ZZ_AR_R20_BBr-03.png
BSP_RW_CH_ZZ_AR_R20_BBr-04.png

@2025 by Bimbranch.

Logox3 Verde.png
bottom of page